A sub base calculator estimates how much compacted aggregate you need beneath a driveway, path, patio, or other paved area. Enter the area’s length and width, the planned compacted depth, and the material’s bulk density to estimate volume and mass; the result is a planning estimate, not a substitute for a site-specific design.
Formula
The calculator treats the surface as a rectangle and multiplies its area by the planned compacted depth:
Volume (m³) = length (m) × width (m) × [depth (mm) ÷ 1000]
Mass (tonnes) = volume (m³) × bulk density (kg/m³) ÷ 1000
- Length and width are the dimensions of the area being covered, in metres.
- Depth is the finished, compacted layer thickness, in millimetres. Dividing by 1,000 converts millimetres to metres.
- Bulk density is the aggregate mass per unit volume, in kilograms per cubic metre. It depends on material, grading, moisture, and how density is measured; 2,000 kg/m³ is a usable estimating default, not a universal property.
- Volume is the geometric compacted volume. The mass output converts kilograms to tonnes by dividing by 1,000.
Worked Example
Using the calculator’s default inputs—length 10 m, width 5 m, compacted depth 150 mm, and assumed bulk density 2,000 kg/m³:
Area = 10 m × 5 m = 50 m².
Depth in metres = 150 mm ÷ 1,000 = 0.15 m.
Compacted volume = 50 m² × 0.15 m = 7.500 m³, displayed as 7.500 m³.
Estimated mass = 7.500 m³ × 2,000 kg/m³ ÷ 1,000 = 15.00 tonnes.
The figures describe the compacted layer. The mass estimate is only as reliable as the density value supplied for the actual aggregate and delivery condition.
Assumptions
- The area is a level rectangle with uniform width and depth.
- The entered depth is the final compacted thickness, not the loose thickness placed before compaction.
- The density is an assumed bulk density suitable for estimating delivered aggregate mass; it is not a guaranteed supplier value.
- The calculation excludes extra material for uneven ground, edge losses, spillage, and variation during construction.
What a Sub Base Does
A sub base is a layer of selected material beneath a pavement or other surface. It helps spread loads over the ground, provides a stable platform for the upper layers, and can support drainage where the design and material allow. It is distinct from the finished surface and, in many pavement designs, from the base course directly beneath that surface.
Thickness and material are design choices, not universal standards. A lightly used garden path and a driveway carrying heavier vehicles may need different specifications. Ground strength, drainage, frost exposure, local construction rules, and the paving system all matter. For a public road, structural pavement, or ground with poor bearing conditions, use the applicable design specification or obtain advice from a qualified professional rather than choosing depth from a generic calculator.
How to Use the Estimate
- Measure the area that will actually receive sub-base. Split an irregular shape into rectangles, calculate each separately, and add the volumes.
- Enter the intended compacted thickness in millimetres. For example, 100 mm is 0.1 m; 200 mm is 0.2 m.
- Use a density from reliable material documentation when available. If you only want a volume estimate, the volume output does not depend on density.
- Compare the mass estimate with the supplier’s ordering units and delivery information. Confirm whether quoted tonnes refer to a particular moisture condition or product specification.
For a non-rectangular area, calculate separate sections instead of forcing the whole site into one length-by-width rectangle. A circular area can be estimated separately using its area, π × radius², then multiplying that area by depth; this calculator itself accepts rectangular dimensions only. Slopes and varying depths require the area to be divided into smaller sections or measured by a suitable surveying method.
Ordering, Compaction, and Common Errors
The calculator finds compacted geometric volume. It does not calculate how many loose cubic metres will arrive in a truck. Loose aggregate occupies a different volume from compacted aggregate because particles settle and voids change as the material is placed and compacted. There is no single reliable conversion factor for every stone, grading, moisture level, and compaction method. Ask the supplier or follow the project specification for an appropriate loose-to-compacted allowance; do not silently treat the two volumes as equal.
Likewise, the mass output is not a precise weighbridge prediction. Density varies, and moisture can increase delivered mass. If the supplier sells by tonne, their product-specific information is more useful than a generic density. If it sells by cubic metre, establish whether that means loose delivered volume or another stated basis.
- Mixing units: enter length and width in metres and depth in millimetres. A depth entered as “0.15” means 0.15 mm, not 150 mm.
- Using the wrong depth: enter compacted depth, not the loose layer thickness or the total build-up including paving.
- Ignoring ground variation: a level calculation can understate requirements if excavation or the subgrade is uneven.
- Over-relying on the default density: replace it with a documented value where mass ordering matters.
- Adding an arbitrary waste percentage: needs vary by site; estimate waste or contingency separately and explain the basis.
Compaction and excavation work can involve heavy equipment, dust, unstable ground, and buried services. Check for underground utilities before digging, use appropriate protective equipment, and follow equipment instructions and local safety requirements.
Frequently Asked Questions
How much sub base do I need for a 10 m by 5 m area?
At 150 mm compacted depth, the volume is 10 × 5 × 0.15 = 7.5 m³. The required loose delivered volume may be higher and depends on the material and compaction; confirm the allowance with the supplier or project specification.
How do I convert sub-base depth from millimetres to metres?
Divide millimetres by 1,000. For example, 150 mm ÷ 1,000 = 0.15 m. Keep the calculator’s depth input in millimetres.
Is the calculator’s tonne result exact?
No. It multiplies compacted volume by the density you enter. Actual delivered mass varies with aggregate grading, moisture, and the density basis, so use supplier information for ordering.
Does the calculator include compaction?
It calculates the volume of the finished compacted layer from the depth you enter. It does not estimate the extra loose volume needed before compaction.
What depth should a sub base be?
There is no one depth for every project. Required thickness depends on loading, ground conditions, drainage, pavement construction, and applicable specifications. Use a project design or local guidance rather than treating a calculator default as a recommendation.
Related
Formula used
in l | Length | m | 10 | 0 in w | Width | m | 5 | 0 in d | Compacted depth | mm | 150 | 0 in rho | Aggregate bulk density | kg/m3 | 2000 | 0 out v | Compacted sub-base volume | m3 | l * w * (d / 1000) | 3 out m | Estimated aggregate mass | tonnes | v * rho / 1000 | 2
Each line is one input (in, sel, list) or one result (out: label, unit, formula, decimals). How the calculators work
Method: the standard formula for this calculation with the constants and conversion factors written on the page, rounded as each result states. See method and constants, the disclaimer or report an error.
More in this section
- How to Find the Continuous Decay Rate
- Total Constant of Decay: How to Calculate It0.000121 1/s
- How to Calculate Decay Constant0.000121 1/s
- Half Life GitHub: What It Is and How to Use It
- Decay Constant: How to Calculate It0.000121 1/s
- Half-Life Games in Order: Full Release Timeline